There was only one project in Chama during Session B, the construction of the Friends Storage Building off site. Because of the lack of projects, no photographers were assigned to Chama for Session B. Fortunately, a couple of cameras in the hands of Team Leader Bob Conry and volunteer Ben Wight were used to capture a couple of the images of building the footers for the building. Along with Bob and Ben, Bob Rieb, Ron Lira, Ron Horejsi, George Trever and Dan Schmidt made up the construction crew.

Photos of the work are presented below. Check out the Session A photos for addition shots of digging the trenches for the foundation.
backhoe.jpg

footer framing.jpg

building site.jpg

rebar.jpg

Ron Horejsi George Trever inspect the finished pour:
Ron & George concrete 1.jpg
Chris James
Editor, C&TS Dispatch
Albuquerque, NM
User avatar
Chris James
Engineer
Engineer
 
Posts: 353
Joined: Tue Nov 29, 2011 10:01 am
Location: Sandia Park, NM

Return to Work Session B (May 24–May 28)

Who is online

Users browsing this forum: No registered users and 1 guest

cron