7/31/17 Monday Emuse addendum - the holding tank is up

Discussion Pertaining to Work Session F - 2017

7/31/17 Monday Emuse addendum - the holding tank is up

Unread postby Sharon Evans » Mon Jul 31, 2017 5:45 pm

Just before 5pm local time with storms all around us, the crane showed up and the sand holding tank is now in place atop the frame sand tower. The main air tank still needs to be placed beside the sand house and that should be done Tuesday once the paint is dry. Also all piping will be done over the next few days. Pictures to follow soon and the video will have to wait until I get home and will be posted to this thread. Roger was also there with the drone in the air so look for his postings.
7-31-17 The crane has arrrived and is deploying its out riggers.jpg
The crane has arrived on site and it deploying its out riggers

7-31-17 The sand holding tank which will be raised to the top of the tower, the bottom of the tank is to the right.jpg
The sand holding tank which will be raised to the top of the tower, the bottom of the tank is to the right

7-31-17 The lift is underway.jpg
The lift is underway

7-31-17 The move to the tower.jpg
The move to the tower

7-31-17 The crew members on the tower are guiding the tank toward its resting place.jpg
The crew members on the tower are guiding the tank toward its final resting place

7-31-17 The tank is being lowered into place guided by the crew on the tower.jpg
The tank is being lowered into place guided by the crew on the tower

7-31-17 After some manual encouragement, the tank is seated into its resting place.jpg
After some manual encouragement the tank is seated into its resting place
7-31-17 The crew on the tower is starting to tighten the bands that will stablize the tank.jpg
The crew on the tower is starting to tighten the bands that will stabilize the tank

7-31-17 The crew is working on the band in the back.jpg
The crew is working on the bank in the back

7-31-17 The crane hook is free and the tank is on its own.jpg
The crane hook is free and the tank is standing on its own
Sharon Evans
Conductor
Conductor
 
Posts: 4886
Joined: Tue Oct 21, 2014 2:54 pm
Location: Glen Allen, VA

Re: 7/31/17 Monday Emuse addendum - the holding tank is up

Unread postby Sharon Evans » Mon Jul 31, 2017 6:46 pm

7-31-17 The straps used to lift the tank are now removed.jpg
The straps used to lift the tank have now been removed
Sharon Evans
Conductor
Conductor
 
Posts: 4886
Joined: Tue Oct 21, 2014 2:54 pm
Location: Glen Allen, VA

Re: 7/31/17 Monday Emuse addendum - the holding tank is up

Unread postby Rick Calkins » Mon Jul 31, 2017 11:19 pm

Sharon, you captured a nice progression of shots and provided meaningful commentary. Thanks
Honored to have Friend's membership ranking of "Conductor."
User avatar
Rick Calkins
Engineer
Engineer
 
Posts: 432
Joined: Thu Sep 08, 2016 9:24 am

Re: 7/31/17 Monday Emuse addendum - the holding tank is up

Unread postby Chris James » Tue Aug 01, 2017 8:49 am

I think the entire Sand House project, from the rebuilt tower to the tanks to the installation, shows just how amazing the Friends' variety of talents, when added together, can restore these priceless pieces of history.

And, thanks for "Sharon" the images!
Chris James
Editor, C&TS Dispatch
Albuquerque, NM
User avatar
Chris James
Engineer
Engineer
 
Posts: 352
Joined: Tue Nov 29, 2011 10:01 am
Location: Sandia Park, NM

Re: 7/31/17 Monday Emuse addendum - the holding tank is up

Unread postby Sharon Evans » Sat Aug 05, 2017 12:01 pm

Have gotten the video of the lift done and here it is all 20+ minutes. This covers the entire process and captures all sounds including Roger's drone buzzing and close by thunder storms.
Sharon Evans
Conductor
Conductor
 
Posts: 4886
Joined: Tue Oct 21, 2014 2:54 pm
Location: Glen Allen, VA


Return to Work Session F (July 31- August 4)

Who is online

Users browsing this forum: No registered users and 2 guests

cron