Friday 7/28/17 Emuse

Discussion Pertaining to Work Session E - 2017

Friday 7/28/17 Emuse

Unread postby Sharon Evans » Fri Jul 28, 2017 1:55 pm

Well the final day of the session provided us with the excitement of a real 9 car double header. Work basically stopped all over the area as the train departed right on the advertise. I had my video camera set up and also took stills but these will not be processed until I get home. Some interesting things happened today with my work teams. The MOW bunk car conversion into a rider car had its stove placed this afternoon with the assistance of the railroad in the form of 489 moving the car to a location where the load could easily get to the door. On photo freights this coal stove will be welcomed in cooler weather.
2017.1295.04258.0728.038.see.jpg
The stove is ready to be placed in the car.

2017.1295.04258.0728.040.see.jpg
The loader with fork attachments is bringing the stove to where it will be placed into the car

2017.1295.04258.0728.041.see.jpg
The 489 has coupled to the bunk car and is ready to shove it back 15'

2017.1295.04258.0728.042.see.jpg
With the car moved to the road crossing the load is moving into deposit the stove in the car

2017.1295.04258.0728.043.see.jpg
The loader has the stove almost inside the car

2017.1295.04258.0728.044.see.jpg
The stove rest in the car

2017.1295.04258.0728.045.see.jpg
The stove now rests on its fire proof base and all it needs is the flue work done
Last edited by Sharon Evans on Fri Jul 28, 2017 2:13 pm, edited 1 time in total.
Sharon Evans
Conductor
Conductor
 
Posts: 4886
Joined: Tue Oct 21, 2014 2:54 pm
Location: Glen Allen, VA

Re: Friday 7/28/17 Emuse

Unread postby Rick Calkins » Fri Jul 28, 2017 2:11 pm

Does your cast iron stove have a place to keep my old enamel 12 cup coffee pot hot? It has been wonderful to have your "eyes" on the ground during this session. Thanks
Honored to have Friend's membership ranking of "Conductor."
User avatar
Rick Calkins
Engineer
Engineer
 
Posts: 432
Joined: Thu Sep 08, 2016 9:24 am

Re: Friday 7/28/17 Emuse

Unread postby Sharon Evans » Fri Jul 28, 2017 2:14 pm

Yes, it will have 2 eyes for heating things.
Sharon Evans
Conductor
Conductor
 
Posts: 4886
Joined: Tue Oct 21, 2014 2:54 pm
Location: Glen Allen, VA

Re: Friday 7/28/17 Emuse

Unread postby Frank Smith » Fri Jul 28, 2017 6:10 pm

Thanks for the nastalgia Sharon. On The Southern Pacific where I was born and raised, the Pot bellied stoves were a staple everywhere. Back then though a sheet of asbestos would be protecting the wall from the heat.
Frank Smith
Fireman
Fireman
 
Posts: 118
Joined: Mon Jul 10, 2017 9:53 am

Re: Friday 7/28/17 Emuse

Unread postby Jim Davenport » Mon Jul 31, 2017 1:57 pm

Wow! The #04258 Sectionmen's Car has come a long way since the rehab started in the 'C' session. A lot of hard work has gone into this project. I can't wait to see it out on the road!
Jim Davenport
Brakeman
Brakeman
 
Posts: 25
Joined: Sun Jan 27, 2013 10:22 am
Location: Tucson

Re: Friday 7/28/17 Emuse

Unread postby Craig Kumler » Tue Aug 01, 2017 9:34 am

All the car needs now is a good ole coffee pot and some cups and off we go! Job well done.
Craig Kumler
Engineer
Engineer
 
Posts: 392
Joined: Mon Nov 28, 2011 4:24 pm
Location: San Jose, Ca.

Re: Friday 7/28/17 Emuse

Unread postby Sharon Evans » Thu Aug 03, 2017 2:29 pm

On Friday work moved forward on the conversion of 3537. Later Thursday, the paint crew had applied the primer coat to the car.
2017.1294.pbox202-boxcar3537.0728.025.see.jpg
Don Bayer and Robert work on attaching the fascia boards to the top of the car

2017.1294.pbox202-boxcar3537.0728.026.see.jpg
Inside the car,, Ron Ross and Kevin Bobb work on the interior sheathing

2017.1294.pbox202-boxcar3537.0728.027.see.jpg
Don Bayer works on installed the door stop on the track at the B end of the right side

2017.1294.pbox202-boxcar3537.0728.028.see.jpg
Randy and Robert are installing the A end fascia board, note it is shaped to match the roof line

2017.1294.pbox202-boxcar3537.0728.028a.see.jpg
Don is grinding off the ends of bolts that will interfere with the installation of the interior sheathing

2017.1294.pbox202-boxcar3537.0728.029.see.jpg
Don is installed the door latching mechanism on the left side of the car
Sharon Evans
Conductor
Conductor
 
Posts: 4886
Joined: Tue Oct 21, 2014 2:54 pm
Location: Glen Allen, VA


Return to Work Session E (July 24-28)

Who is online

Users browsing this forum: No registered users and 2 guests