Antonito work on 783 continues at a rapid pace

Discussion Pertaining to Work Session F - 2014

Antonito work on 783 continues at a rapid pace

Unread postby Ed Lowrance » Thu Aug 07, 2014 5:44 am

]Team Leader Bill Pratt, Co team leader Warren Ringer (behind camera) Volunteers Randy and Lee Parks, Bob Osborn, Cole Adams,and Don Atkinson are hard at work reassembling DBG 783.

P8060169.JPG
Brake Cylinder ready for installation Friday. Truss rod turnbuckles will also be installed after the Clinder is in place, The first hinge blocks are installed.
P8060169.JPG (35.56 KiB) Viewed 1798 times


P8060169.JPG
Brake Cylinder ready for installation Friday. Truss rod turnbuckles will also be installed after the Clinder is in place, The first hinge blocks are installed.
P8060169.JPG (35.56 KiB) Viewed 1798 times
Attachments
P8050161.JPG
preparing to lower the car onto its trucks so truss rods can be installed
P8050161.JPG (34.68 KiB) Viewed 1798 times
P8060166-1.JPG
Lee parks and the first of 12 doors
P8060166-1.JPG (30.85 KiB) Viewed 1798 times
P8060168.JPG
783 back on its trucks. A end. Center truss rods are in both ends & the bolster strap is ready to be installed
P8060168.JPG (31.98 KiB) Viewed 1798 times